https://register.epo.org/espacenet/s...rt&query=Keshehttp://banchedati.camera.it/sindacat...=62130&stile=6http://22passi.blogspot.it/2012/12/k...o-post-di.htmlNothing happened.
Nothing happened.
A comment by the participating, well known Prof. Dr.-Ing. Konstantin Meyl from Germany:
Postponed until December?
Later he postponed the delivery from early 2012 to December 2012. Throughout 2012 he repeatedly confirmed this date, until December 21st:
These are approximately the same conclusions to which I came after intensely studying the large amount of material available on the web from and about Keshe.
Continued ...
In the next few days we will announce the first lift and flight presentation of the system for public. These presentations will be held in one city in each continent over 5 month.
(Keshe on 07/17/2009: http://peswiki.com/index.php/Directory:Keshe_Foundation)
(Keshe on 07/17/2009: http://peswiki.com/index.php/Directory:Keshe_Foundation)
http://elektor.de/elektronik-news/be....1041431.lynkx ; translated from German by me)
[...]
On 21 September 2012 the Keshe Foundation will release the first phase of its space technology and the gravitational and magnetic (Magravs) systems it has developed, to all scientists around the world simultaneously, for production and duplication.
[...]
From that point on, international borders will cease to have any real significance.
[...]
The energy crisis will be resolved at a stroke, and once the technology is put into practice the powers that control energy supplies and through them the present financial structures will find their hands empty.
[...]
(http://keshefoundation.org/media-a-p...echnology.html)
On 21 September 2012 the Keshe Foundation will release the first phase of its space technology and the gravitational and magnetic (Magravs) systems it has developed, to all scientists around the world simultaneously, for production and duplication.
[...]
From that point on, international borders will cease to have any real significance.
[...]
The energy crisis will be resolved at a stroke, and once the technology is put into practice the powers that control energy supplies and through them the present financial structures will find their hands empty.
[...]
(http://keshefoundation.org/media-a-p...echnology.html)
http://energiederzukunft.org/forum/5...6&start=12#308 ; translated from German by me)
The 14.12.2012 presentation is canceled because the Belgian authorities, on the instruction of the government, have officially and in writing forbidden our nuclear research activity.
(Keshe on 11/25/2012: http://forum.keshefoundation.org/sho...=4022#post4022)
(Keshe on 11/25/2012: http://forum.keshefoundation.org/sho...=4022#post4022)
The Foundation submits for sale as of today for delivery early next year [2012] the following:
Portable 3-4 KW power systems on DC and AC 24 hours a day supply for the value of 5000 euros.
(Keshe on 04/11/2011: http://forum.keshefoundation.org/sho...=1257#post1257)
Portable 3-4 KW power systems on DC and AC 24 hours a day supply for the value of 5000 euros.
(Keshe on 04/11/2011: http://forum.keshefoundation.org/sho...=1257#post1257)
[W]e have redesigned and corrected a number of systems in the reactor in order to comply with all international laws with respect to the use and safety of the systems.
Because of these adjustments, we have to delay the delivery of the systems by 45-60 days from 31.12.2012.
(Keshe on 12/21/2012: http://forum.keshefoundation.org/sho...=5446#post5446)
Because of these adjustments, we have to delay the delivery of the systems by 45-60 days from 31.12.2012.
(Keshe on 12/21/2012: http://forum.keshefoundation.org/sho...=5446#post5446)
Due to delivery from suppliers for some parts of the new [vacuum] seal systems we are behind the testing and releasing the generators.
Once we receive the newly manufactured parts in the second week of March from the manufactures: It will take us another 15 to 30 days to test and finally release the generators.
(Keshe on 02/26/2013: http://forum.keshefoundation.org/sho...=8799#post8799)
Once we receive the newly manufactured parts in the second week of March from the manufactures: It will take us another 15 to 30 days to test and finally release the generators.
(Keshe on 02/26/2013: http://forum.keshefoundation.org/sho...=8799#post8799)
http://giannicomoretto.blogspot.com/...-risposta.html ; translated from Italian by me)
Continued ...

Keshe... a scammer?!?! He was on PESN's Top 5 list! You gotta be joking! Tell me you're joking! Do you know how much my ticket to the moon cost!?!?!?!?
):
Comment